The Complete Home Renovation Planning Checklist

Apex Groupe ConstructionApril 7, 20266 min read
Renovation planning checklist and moodboard on a desk

Every smooth renovation has one thing in common: the planning happened before the demolition, not during it. The projects that stall or run over budget are almost never the ones where the contractor did bad work - they're the ones where a decision, a permit, or a material order got left until it was too late to handle without a delay. This checklist walks through everything worth thinking about before you start, roughly in the order you'll need to tackle it.

1. Budget

Budget comes first because it shapes every decision after it. Start by defining a realistic range for your project rather than a single fixed number, and build in a contingency on top of that range - especially for older homes, where opening a wall can reveal things an estimate walkthrough couldn't predict.

  • Set a total budget range, including a contingency of roughly 10-20% depending on your home's age and the project's scope.
  • Decide what's most important to you if trade-offs become necessary - layout, materials, or timeline.
  • Understand what's typically included versus excluded in a renovation quote (permits, design fees, appliances).
  • Read our renovation cost guide to understand what actually drives cost up or down for your project type.

2. Design and scope

Before you request quotes, get as specific as possible about what you actually want. "Update the kitchen" means something different to every contractor and will produce quotes that aren't comparable to each other. The more defined your scope is, the more accurate - and comparable - your quotes will be.

  • Write down what's changing, what's staying, and what's a priority versus a nice-to-have.
  • Collect reference images or examples of finishes and layouts you like.
  • Decide on layout changes early, since they affect plumbing, electrical, and permit requirements.
  • Finalize your scope as much as possible before requesting quotes, to keep comparisons accurate.

3. Permits

Permit requirements depend on your specific project and your municipality or borough, and they should be checked early - not after work has already started. Structural changes, additions, new electrical circuits, plumbing relocation, and new living spaces commonly require permits, though this varies by project and location.

  • Identify whether your project likely involves structural, electrical, or plumbing changes.
  • Verify permit requirements directly with your municipality or borough before finalizing your timeline.
  • Build permit review time into your project schedule, not just construction time.
  • See our guide on permits for home renovations in Montreal for a fuller overview - and always confirm directly with your local building department.

4. Materials and finishes

Material selection affects both your budget and your timeline, and it's one of the most common causes of project delays when it's left too late. Custom cabinetry, specialty tile, and made-to-order fixtures can have lead times of several weeks, and if they're not ordered early, they become the bottleneck for your entire project regardless of how quickly construction itself moves.

  • Finalize major material selections (cabinetry, countertops, tile, flooring, fixtures) before construction starts.
  • Ask your contractor about lead times for anything custom-ordered.
  • Confirm quantities and finalize orders early enough to avoid delaying the construction schedule.
  • Keep a shared list of exact product names, finishes, and models to avoid mix-ups mid-project.

5. Timeline

A realistic timeline accounts for more than just the days of physical construction - it includes permit approval time, material lead times, and buffer for the kind of surprises that come up in older homes. Ask your contractor for a written timeline, and ask specifically how and when you'll be informed if it changes.

  • Get a written project timeline before construction starts, not a verbal estimate.
  • Confirm how permit and material lead times factor into the schedule.
  • Align your own plans - moving dates, events, other projects - around the realistic timeline, with some buffer.
  • Ask how communication about timeline changes will work.

6. Temporary living arrangements

Larger renovations - a full kitchen gut, a full home renovation, or a project affecting your only bathroom - may require some adjustment to daily life, even if you're staying in the home throughout. Talk to your contractor early about what to expect.

  • Ask whether your project will affect access to a kitchen or bathroom, and for how long.
  • Plan alternate arrangements in advance if a key space will be unusable for an extended period.
  • Discuss dust and noise expectations, especially if you work from home or have young children.
  • For larger projects, ask your contractor how they sequence work to minimize disruption to daily living.

7. Storage

Renovations generate a surprising amount of displacement - furniture needs to move, cabinets get emptied, and rooms adjacent to the work zone often become informal storage. Planning for this ahead of time prevents a lot of last-minute scrambling.

  • Plan where furniture and belongings from the renovated space will go during construction.
  • Consider a storage unit or pod for larger projects, particularly full home renovations.
  • Protect and store valuables and fragile items away from the work zone entirely.
  • Ask your contractor how they protect the rest of your home (flooring, adjacent rooms) during construction.

8. Contracts

Everything discussed verbally during the estimate process should end up in writing before work begins. A clear, detailed contract protects both you and your contractor, and it's the reference point if any questions come up once construction is underway.

  • Confirm scope, materials, and timeline are all documented in writing, not just discussed verbally.
  • Understand the payment schedule and what milestone triggers each payment.
  • Clarify how changes to scope will be documented and priced if they come up.
  • Verify your contractor's RBQ licence and insurance before signing. Our guide on choosing a general contractor in Montreal covers exactly what to check.

9. Communication plan

Decide upfront how you and your contractor will communicate throughout the project. This single detail prevents more frustration than almost anything else on this list, because most renovation friction comes from unclear expectations about who to contact and how quickly you'll hear back.

  • Confirm your main point of contact for the duration of the project.
  • Ask how often you'll receive updates, and through what channel.
  • Establish how urgent issues (a leak, a damaged item) will be handled and reported.
  • Agree on how decisions and approvals will be documented, especially for any mid-project changes.

10. Final inspection and walkthrough

Before you consider a project complete, walk through every space with your contractor. This is your opportunity to catch anything that needs adjustment while the crew is still available, rather than after they've moved on to the next project.

  • Schedule a final walkthrough before final payment, and bring a detailed checklist.
  • Test everything - outlets, fixtures, doors, drawers, and appliances - during the walkthrough, not after.
  • Confirm any required permit inspections have passed and are documented.
  • Ask about warranty coverage on workmanship and what to do if something needs adjustment after you move back in.

Use this checklist as a starting point

Every project is different, and some of these steps matter more for a full home renovation than for a single bathroom refresh. Use this as a framework, and lean on your contractor to help tailor it to your specific project during the estimate process.

Download our free guide: 7 mistakes to avoid

Pair this checklist with our free guide on the 7 mistakes that can compromise your renovation project to prepare your project with confidence before you request quotes.

Ready to talk to a contractor?

Get a free, detailed written estimate for your project - no obligation, no pressure.

Get Your Free Estimate
A

Apex Groupe Construction

Montreal Renovation Contractor

Ready to start your renovation in Montreal?

Book a free consultation. We will visit your home, discuss your vision, and give you a detailed written estimate - no obligation.

Call NowFree Estimate